IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0044 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,856 $10,866 Not Implemented
BS0044 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $10,868 Implemented
BS0044 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,126 $1,190 Implemented
BS0044 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $2,041 $610 Not Implemented
BS0043 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $63,855 $15,000 Implemented
BS0043 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $8,916 $19,760 Not Implemented
BS0043 # 03 Y:2014 03 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $111,915 $69,000 Implemented
BS0043 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,411 $5,075 Implemented
BS0043 # 05 Y:2014 05 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $13,508 $17,493 Not Implemented
BS0043 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,075 $429 Implemented
BS0043 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,042 $52,954 Not Implemented
BS0043 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,340 $981 Not Implemented
BS0043 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,381 $7,554 Not Implemented
BS0043 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,014 $1,242 Not Implemented
MI0267 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $18,615 $80,000 Implemented
MI0267 # 02 Y:2014 02 2014 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,962 $2,560 Not Implemented
MI0267 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,086 $80 Not Implemented
MI0267 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,029 $3,340 Implemented
MI0267 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,950 $429 Implemented
MI0267 # 06 Y:2014 06 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,765 $3,600 Not Implemented
MI0267 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,203 $760 Not Implemented
MI0267 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,006 $80 Not Implemented
MI0267 # 09 Y:2014 09 2014 MINIMIZE WATER USAGE $1,960 $1,930 Not Implemented
MI0267 # 10 Y:2014 10 2014 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,873 $8,000 Not Implemented
MI0267 # 11 Y:2014 11 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,235 $2,100 Not Implemented