Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
211
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
MA0669 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $10,179 | $11,190 | Implemented |
MA0669 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $410 | $550 | Implemented |
MA0669 # 04 Y:2011 | 04 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,848 | $1,500 | Implemented |
MA0669 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $28,774 | $63,300 | Implemented |
UA0053 # 06 Y:2010 | 06 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,505 | $1,000 | Implemented |
UA0053 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $351 | $906 | Implemented |
UA0053 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $218 | $177 | Implemented |
LL0302 # 01 Y:2008 | 01 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $14,663 | $30 | Implemented |
LL0302 # 03 Y:2008 | 03 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,364 | $450 | Implemented |
LL0268 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $44,247 | $9,812 | Implemented |
LL0268 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,179 | $317 | Implemented |
MS0259 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,687 | $150 | Implemented |
MS0259 # 06 Y:2004 | 06 | 2004 | HEAT WATER WITH EXHAUST HEAT | $5,972 | $0 | Implemented |
MS0259 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,277 | $0 | Implemented |
MS0259 # 07 Y:2004 | 07 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,481 | $245,000 | Implemented |
MS0246 # 01 Y:2004 | 01 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $29,186 | $4,860 | Implemented |
MS0246 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $158 | Implemented |
MS0246 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $868 | $1,063 | Implemented |
MS0246 # 10 Y:2004 | 10 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $176 | $407 | Implemented |
SD0336 # 01 Y:2004 | 01 | 2004 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $29,002 | $0 | Implemented |
SD0336 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,638 | $6,230 | Implemented |
SD0336 # 04 Y:2004 | 04 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,095 | $0 | Implemented |
OR0387 # 05 Y:2001 | 05 | 2001 | $57,000 | $74,000 | Implemented | |
OR0387 # 06 Y:2001 | 06 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,800 | $5,850 | Implemented |