Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
220
matching recommendationsSIC | 2092 | Fresh Or Frozen Prepared Fish |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0043 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,411 | $5,075 | Implemented |
BS0043 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,075 | $429 | Implemented |
MI0267 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,950 | $429 | Implemented |
MI0267 # 04 Y:2014 | 04 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,029 | $3,340 | Implemented |
MI0267 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $18,615 | $80,000 | Implemented |
OR0614 # 02 Y:2013 | 02 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,101 | $10,000 | Implemented |
OR0614 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,327 | $0 | Implemented |
OR0599 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,611 | $12,467 | Implemented |
OR0599 # 02 Y:2012 | 02 | 2012 | INSTALL AUTOMATIC PACKING EQUIPMENT | $35,308 | $0 | Implemented |
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
MA0669 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $10,179 | $11,190 | Implemented |
MA0669 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $410 | $550 | Implemented |
MA0669 # 04 Y:2011 | 04 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,848 | $1,500 | Implemented |
MA0669 # 01 Y:2011 | 01 | 2011 | REPLACE BOILER | $28,774 | $63,300 | Implemented |
UA0053 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $218 | $177 | Implemented |
UA0053 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $351 | $906 | Implemented |
UA0053 # 06 Y:2010 | 06 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,505 | $1,000 | Implemented |
LL0302 # 01 Y:2008 | 01 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $14,663 | $30 | Implemented |
LL0302 # 03 Y:2008 | 03 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,364 | $450 | Implemented |
LL0268 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $44,247 | $9,812 | Implemented |
LL0268 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,179 | $317 | Implemented |
MS0259 # 07 Y:2004 | 07 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,481 | $245,000 | Implemented |
MS0259 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,687 | $150 | Implemented |
MS0259 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,277 | $0 | Implemented |
MS0259 # 06 Y:2004 | 06 | 2004 | HEAT WATER WITH EXHAUST HEAT | $5,972 | $0 | Implemented |