IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0349 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,649 $0 Implemented
WV0159 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $566 $512 Implemented
WV0159 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $30 Implemented
WV0159 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $100 Implemented
WV0159 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $175 Implemented
WV0159 # 09 Y:1999 09 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,660 $55 Implemented
WV0159 # 11 Y:1999 11 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $108,645 $100,000 Implemented
NC0158 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $384 $120 Implemented
NC0158 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $235 $250 Implemented
NC0158 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $972 $907 Implemented
NC0158 # 06 Y:1999 06 1999 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,335 $20,780 Implemented
NC0158 # 07 Y:1999 07 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,794 $2,500 Implemented
NC0158 # 08 Y:1999 08 1999 REDUCE SCRAP PRODUCTION $2,360 $4,100 Implemented
NC0158 # 09 Y:1999 09 1999 CLEAR AND RENT EXISTING SPACE $26,000 $640 Implemented
NC0158 # 10 Y:1999 10 1999 MOVE PRODUCT USING MECHANICAL MEANS $3,600 $500 Implemented
NC0158 # 11 Y:1999 11 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $680 $1,000 Implemented
NC0160 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,733 $1,400 Implemented
NC0160 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,043 $2,000 Implemented
NC0160 # 04 Y:1999 04 1999 INSTALL SKYLIGHTS $1,207 $2,000 Implemented
NC0160 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,045 $1,550 Implemented
NC0160 # 07 Y:1999 07 1999 ADOPT IN-HOUSE MATERIAL GENERATION $49,559 $100,000 Implemented
WV0155 # 08 Y:1998 08 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $75 $0 Implemented
WV0155 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $670 Implemented
WV0155 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,280 Implemented
WV0155 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $24,472 $4,450 Implemented