Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,957
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0092 # 06 Y:1997 | 06 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,500 | $4,095 | Implemented |
HO0161 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,362 | $11,311 | Implemented |
HO0161 # 03 Y:1997 | 03 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $723 | $385 | Implemented |
HO0161 # 05 Y:1997 | 05 | 1997 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $480 | $100 | Implemented |
HO0161 # 07 Y:1997 | 07 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $12,500 | $2,000 | Implemented |
GT0622 # 01 Y:1997 | 01 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $980 | $2,000 | Implemented |
GT0622 # 02 Y:1997 | 02 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $3,470 | $1,200 | Implemented |
GT0622 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,626 | $300 | Implemented |
GT0622 # 05 Y:1997 | 05 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,060 | $632 | Implemented |
OD0086 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,489 | $2,400 | Implemented |
OD0086 # 03 Y:1997 | 03 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,515 | $1,500 | Implemented |
ME0218 # 01 Y:1997 | 01 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $54,750 | $10,120 | Implemented |
ME0218 # 06 Y:1997 | 06 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,213 | $1,400 | Implemented |
GT0614 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $590 | $7,976 | Implemented |
GT0614 # 07 Y:1997 | 07 | 1997 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,643 | $4,500 | Implemented |
OK0523 # 02 Y:1997 | 02 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $65,338 | $74,935 | Implemented |
OK0523 # 04 Y:1997 | 04 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $72,212 | $16,000 | Implemented |
OK0523 # 05 Y:1997 | 05 | 1997 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,478 | $6,900 | Implemented |
OK0523 # 07 Y:1997 | 07 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,077 | $0 | Implemented |
MA0388 # 01 Y:1997 | 01 | 1997 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $95,807 | $47,527 | Implemented |
MA0388 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,884 | $4,925 | Implemented |
MA0388 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $604 | $272 | Implemented |
MA0388 # 07 Y:1997 | 07 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,002 | $0 | Implemented |
MA0388 # 08 Y:1997 | 08 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $32,204 | $55,094 | Implemented |
GT0612 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,332 | $900 | Implemented |