Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0766 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,855 | $2,000 | Implemented |
MA0766 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,210 | $50,500 | Implemented |
MA0766 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,894 | $2,462 | Implemented |
MA0729 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,173 | $200 | Implemented |
MA0729 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,956 | $3,300 | Implemented |
MA0729 # 02 Y:2014 | 02 | 2014 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,490 | $500 | Implemented |
MAS033 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,549 | $7,500 | Implemented |
MA0671 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $740 | $200 | Implemented |
MA0671 # 02 Y:2011 | 02 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,780 | $3,550 | Implemented |
MA0653 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | Implemented |
MA0653 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $16,188 | $752 | Implemented |
MA0641 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,028 | $3,000 | Implemented |
MA0599 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,051 | $7,865 | Implemented |
MA0599 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $627 | $600 | Implemented |
MA0599 # 08 Y:2006 | 08 | 2006 | REDUCE FLUID FLOW RATES | $2,270 | $600 | Implemented |
MA0599 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,780 | $12,325 | Implemented |
MA0599 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $10,010 | $5,280 | Implemented |
MA0599 # 03 Y:2006 | 03 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $17,205 | $10,250 | Implemented |
MA0577 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,371 | $300 | Implemented |
MA0577 # 06 Y:2005 | 06 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,784 | $40,425 | Implemented |
MA0577 # 04 Y:2005 | 04 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $28,600 | $980 | Implemented |
MA0577 # 03 Y:2005 | 03 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,138 | $58,000 | Implemented |
MA0577 # 02 Y:2005 | 02 | 2005 | IMPROVE COMBUSTION CONTROL CAPABILITY | $52,930 | $50,000 | Implemented |
MA0577 # 01 Y:2005 | 01 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $75,813 | $205,500 | Implemented |
MA0571 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,977 | $25,856 | Implemented |