IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0838 # 10 Y:2011 10 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,749 $125 Implemented
UD0838 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,238 $500 Implemented
UD0838 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $14,654 $20,000 Implemented
WV0258 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $931 $44 Implemented
WV0258 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,129 $525 Implemented
WV0258 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $646 $244 Implemented
WV0258 # 07 Y:2003 07 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,432 $1,000 Implemented
WV0258 # 09 Y:2003 09 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,163 $220 Implemented
WV0258 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $7,852 $2,734 Implemented
WV0258 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,489 $200 Implemented
WV0258 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,945 $250 Implemented
WV0159 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $566 $512 Implemented
WV0159 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $175 Implemented
WV0159 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $30 Implemented
WV0159 # 11 Y:1999 11 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $108,645 $100,000 Implemented
WV0159 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $100 Implemented
WV0159 # 09 Y:1999 09 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,660 $55 Implemented
UD0415 # 02 Y:1993 02 1993 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,020 $3,000 Implemented
UD0415 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,314 $31,350 Implemented
UD0381 # 02 Y:1992 02 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $10,472 $10,000 Implemented
UD0312 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $2,400 Implemented
UD0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,262 $7,825 Implemented
UD0312 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,422 $2,000 Implemented
UD0312 # 06 Y:1990 06 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $0 Implemented
UD0312 # 09 Y:1990 09 1990 REPAIR AND ELIMINATE STEAM LEAKS $24,995 $0 Implemented