IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0838 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $14,654 $20,000 Implemented
UD0838 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,238 $500 Implemented
UD0838 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,034 $7,000 Not Implemented
UD0838 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,370 $124,541 Not Implemented
UD0838 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,828 $100,000 Not Implemented
UD0838 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,630 $78,000 Not Implemented
UD0838 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,585 $15,000 Not Implemented
UD0838 # 10 Y:2011 10 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,749 $125 Implemented
MA0671 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,635 $200,000 Not Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,556 $15,000 Not Implemented
MA0671 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,328 $2,220 Not Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
TT0067 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $303,919 $125,000 Not Implemented
NC0424 # 01 Y:2011 01 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $51,507 $142,273 Not Implemented
NC0424 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,681 $112,768 Implemented
NC0424 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $4,435 Implemented
NC0424 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,685 $78,795 Implemented
NC0424 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,791 $100 Implemented
NC0424 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $27,638 $74,990 Not Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 04 Y:2011 04 2011 USE MINIMUM SAFE OVEN VENTILATION $2,775 $6,150 Not Implemented
MA0670 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $523 $1,000 Not Implemented