IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0204 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $2,900 $6,800 Implemented
NC0204 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,960 $730 Implemented
NC0204 # 06 Y:2000 06 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,422 $1,100 Implemented
NC0204 # 07 Y:2000 07 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,074 $1,000 Implemented
NC0204 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $421 $90 Implemented
NC0204 # 11 Y:2000 11 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $375 $500 Implemented
NC0178 # 01 Y:1999 01 1999 MODIFY TEXTILE DRYERS $72,691 $1,000 Implemented
NC0178 # 02 Y:1999 02 1999 CHECK FOR ACCURACY OF UTILITY / POWER METERS $14,400 $5,600 Implemented
NC0178 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $74,238 $5,000 Implemented
NC0178 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,173 $2,500 Implemented
GT0667 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $162 $50 Implemented
GT0667 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,292 $18,568 Implemented
MA0417 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $195 Implemented
HO0171 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,021 $5,131 Implemented
HO0171 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $50 Implemented
HO0171 # 08 Y:1998 08 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $64,007 $2,200 Implemented
HO0171 # 09 Y:1998 09 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,116 $1,000 Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented
MA0405 # 02 Y:1997 02 1997 MINIMIZE WATER USAGE $25,165 $3,413 Implemented
MA0405 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,177 $28,900 Implemented
MA0405 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,335 $1,620 Implemented
NC0129 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,492 $1,000 Implemented