IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0667 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $162 $50 Implemented
GT0667 # 06 Y:1999 06 1999 MOVE PRODUCT USING MECHANICAL MEANS $52,560 $8,050 Not Implemented
GT0667 # 04 Y:1999 04 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $62 $200 Not Implemented
GT0594 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,591 $9,855 Implemented
GT0594 # 04 Y:1996 04 1996 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,740 $15,240 Not Implemented
GT0594 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,380 $0 Implemented
GT0594 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,700 $1,263 Not Implemented
GT0594 # 05 Y:1996 05 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $112,836 $405,000 Implemented
GT0504 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $790 $600 Implemented
GT0504 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $500 Implemented
GT0504 # 04 Y:1993 04 1993 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $3,630 $250 Implemented
GT0504 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,900 $11,430 Implemented
GT0504 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,450 $500 Implemented
GT0504 # 02 Y:1993 02 1993 REPAIR AND ELIMINATE STEAM LEAKS $3,240 $400 Implemented
GT0504 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,225 $900 Implemented
GT0504 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $5,760 Not Implemented
TN0476 # 01 Y:1992 01 1992 INSULATE BARE EQUIPMENT $9,523 $2,425 Not Implemented
TN0476 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $8,013 $2,350 Not Implemented
TN0476 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $56,030 $36,440 Not Implemented
TN0476 # 04 Y:1992 04 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $4,854 $1,100 Not Implemented
TN0476 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,303 $2,307 Not Implemented
TN0476 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $3,357 $0 Not Implemented
GT0348 # 03 Y:1988 03 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,419 $3,600 Implemented
GT0348 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $461 $456 Implemented
GT0348 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,310 $0 Implemented