IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 2261 Finishing Plants, Cotton
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1017 # 01 Y:2023 01 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,638 $57,344 Implemented
CM1017 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $738 $0 Implemented
CM1017 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,890 $15,750 Implemented
CM1017 # 04 Y:2023 04 2023 REPLACE BOILER $20,045 $41,481 Implemented
CM1017 # 05 Y:2023 05 2023 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $1,538 $4,396 Implemented
CM1017 # 07 Y:2023 07 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,464 $3,500 Implemented
MI0307 # 14 Y:2017 14 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $359 $40 Implemented
MI0307 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $12,345 $3,600 Implemented
MI0307 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,347 $1,660 Implemented
MI0307 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,777 $23,135 Implemented
MI0307 # 13 Y:2017 13 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $692 $240 Implemented
MI0307 # 07 Y:2017 07 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,323 $1,720 Implemented
MI0307 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,536 $3,370 Implemented
MA0766 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $50,500 Implemented
MA0766 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $3,894 $2,462 Implemented
MA0766 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,855 $2,000 Implemented
MA0729 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,956 $3,300 Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented
MA0729 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $200 Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
LM0121 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,390 $10,233 Implemented
LM0121 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,734 $3,100 Implemented
GT0754 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,324 $2,271 Implemented