IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 2261 Finishing Plants, Cotton
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0754 # 11 Y:2003 11 2003 RECOVER AND REUSE COOLING WATER $293,681 $201,600 Implemented
GT0754 # 06 Y:2003 06 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $87,548 $12,750 Implemented
GT0754 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $1,414 Implemented
GT0754 # 01 Y:2003 01 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $24,451 $69,000 Implemented
GT0754 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $840 $678 Implemented
GT0754 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,080 $0 Implemented
GT0754 # 02 Y:2003 02 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $146,600 $104,000 Implemented
MA0516 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $5,343 $8,400 Implemented
MA0516 # 01 Y:2002 01 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $151,365 $135,000 Implemented
MA0516 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $625 Implemented
MA0516 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $460 Implemented
MA0516 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,589 $5,200 Implemented
LM0021 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,054 $400 Implemented
LM0021 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,649 $6,000 Implemented
LM0021 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,680 $48,707 Implemented
LM0021 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,082 $857 Implemented
NC0178 # 02 Y:1999 02 1999 CHECK FOR ACCURACY OF UTILITY / POWER METERS $14,400 $5,600 Implemented
NC0178 # 01 Y:1999 01 1999 MODIFY TEXTILE DRYERS $72,691 $1,000 Implemented
NC0178 # 08 Y:1999 08 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,173 $2,500 Implemented
NC0178 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $74,238 $5,000 Implemented
MA0417 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $195 Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented