IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

249

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
GT0743 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $5,598 $0 Not Implemented
GT0743 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $671 $0 Not Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
GT0743 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $78,433 $112,650 Not Implemented
GT0743 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,792 $5,050 Not Implemented
GT0743 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,206 $17,240 Not Implemented
GT0743 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,666 $0 Not Implemented
NC0225 # 06 Y:2001 06 2001 KEEP BOILER TUBES CLEAN $3,649 $13,000 Implemented
NC0225 # 05 Y:2001 05 2001 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $20,000 $40,000 n/a
NC0225 # 04 Y:2001 04 2001 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $15,365 $5,000 Implemented
NC0225 # 03 Y:2001 03 2001 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $27,745 $33,990 n/a
NC0225 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,625 $33,848 Implemented
NC0225 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $2,783 $1,895 Implemented
NC0225 # 07 Y:2001 07 2001 REPAIR AND ELIMINATE STEAM LEAKS $8,655 $3,500 Implemented
NC0225 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,105 $100,000 Implemented
GT0708 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,650 $21,400 Implemented
GT0708 # 01 Y:2001 01 2001 MOVE BOILER TO MORE EFFICIENT LOCATION $7,140 $0 Implemented
GT0708 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,765 $0 Implemented
GT0708 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $11,677 $1,000 Not Implemented
GT0708 # 06 Y:2001 06 2001 REPAIR OR REPLACE STEAM TRAPS $9,164 $10,500 Implemented
GT0708 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $38,843 $13,500 Implemented
GT0708 # 05 Y:2001 05 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,090 $60,000 Not Implemented
NC0204 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,133 $257 Implemented
NC0204 # 01 Y:2000 01 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $4,201 $2,350 Implemented