IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

326

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0161 # 05 Y:1997 05 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $480 $100 Implemented
HO0161 # 03 Y:1997 03 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $723 $385 Implemented
HO0161 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $11,311 Implemented
OK0523 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,077 $0 Implemented
OK0523 # 05 Y:1997 05 1997 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,478 $6,900 Implemented
OK0523 # 04 Y:1997 04 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $72,212 $16,000 Implemented
OK0523 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $65,338 $74,935 Implemented
GT0607 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,960 $62,150 Implemented
GT0607 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,568 $29,830 Implemented
GT0607 # 05 Y:1997 05 1997 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $90,000 $21,000 Implemented
GT0607 # 06 Y:1997 06 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,086 $15,000 Implemented
GT0607 # 07 Y:1997 07 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,924 $13,000 Implemented
GT0607 # 08 Y:1997 08 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $30,229 $18,000 Implemented
NC0103 # 06 Y:1996 06 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,100 $10,000 Implemented
NC0103 # 05 Y:1996 05 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,167 $530 Implemented
NC0103 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,152 $350 Implemented
NC0103 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,500 $6,167 Implemented
OD0067 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,202 $400 Implemented
OD0066 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,114 $400 Implemented
GT0593 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,920 $147,550 Implemented
GT0593 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $1,900 $0 Implemented
GT0593 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,670 $1,000 Implemented
GT0593 # 06 Y:1996 06 1996 METER WASTE WATER $3,630 $0 Implemented
HO0136 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,736 $6,500 Implemented
HO0136 # 04 Y:1996 04 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,059 $145,000 Implemented