Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 2392 | Housefurnishings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0492 # 05 Y:2013 | 05 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $0 | Implemented |
NC0492 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,492 | $1,140 | Implemented |
NC0304 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,732 | $100 | Implemented |
NC0304 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,821 | $400 | Implemented |
NC0304 # 02 Y:2004 | 02 | 2004 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $27,494 | $13,050 | Implemented |
NC0304 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,008 | $3,000 | Implemented |
NC0230 # 05 Y:2002 | 05 | 2002 | ADD AREA LIGHTING SWITCHES | $1,053 | $3,340 | Implemented |
NC0230 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $893 | $500 | Implemented |
NC0230 # 02 Y:2002 | 02 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $1,099 | $1,354 | Implemented |
NC0230 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $797 | $1,040 | Implemented |
NC0230 # 09 Y:2002 | 09 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $4,254 | $3,500 | Implemented |
GT0724 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,832 | $1,800 | Implemented |
GT0724 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,279 | $5,900 | Implemented |
GT0724 # 05 Y:2001 | 05 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,956 | $7,500 | Implemented |
GT0723 # 06 Y:2001 | 06 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,965 | $1,418 | Implemented |
GT0723 # 05 Y:2001 | 05 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $76,655 | $0 | Implemented |
GT0723 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,036 | $350 | Implemented |
GT0723 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $825 | Implemented |
GT0723 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,140 | $68,913 | Implemented |
GT0723 # 01 Y:2001 | 01 | 2001 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $21,103 | $60,000 | Implemented |
NC0101 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $387 | $422 | Implemented |
NC0101 # 05 Y:1996 | 05 | 1996 | REDUCE SCRAP PRODUCTION | $2,052 | $0 | Implemented |
NC0101 # 04 Y:1996 | 04 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $625 | $100 | Implemented |
NC0101 # 03 Y:1996 | 03 | 1996 | ADD AREA LIGHTING SWITCHES | $1,162 | $750 | Implemented |
AT0105 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,053 | $1,500 | Implemented |