IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,421

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0335 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $430 Implemented
ND0335 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $120 Implemented
ND0335 # 06 Y:1999 06 1999 USE OPTIMUM TEMPERATURE $78 $10 Implemented
ND0335 # 07 Y:1999 07 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $51 $50 Implemented
AR0167 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $3,707 $1,791 Implemented
AR0167 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $5,846 $2,240 Implemented
AR0167 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,264 $5,441 Implemented
AR0167 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $250 Implemented
AR0167 # 04 Y:1999 04 1999 REPAIR AND ELIMINATE STEAM LEAKS $7,742 $205 Implemented
AR0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,523 $0 Implemented
AR0167 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,567 $200 Implemented
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented
CO0447 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $660 Implemented
CO0447 # 05 Y:1999 05 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $80,060 $200,000 Implemented
OR0349 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,560 $64,125 Implemented
OR0349 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,088 $10,000 Implemented
OR0349 # 06 Y:1999 06 1999 UPGRADE CONTROLS ON COMPRESSORS $24,695 $2,840 Implemented
ME0271 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,060 $47,675 Implemented
ME0271 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,694 $11,058 Implemented
ME0271 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $150 Implemented
ME0271 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $366 $407 Implemented
ME0271 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $224 $100 Implemented
ME0271 # 09 Y:1999 09 1999 METER WASTE WATER $1,684 $200 Implemented
IA0225 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,393 $381 Implemented
IA0225 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $988 $0 Implemented