IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,167

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0622 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $10,631 $10,763 Not Implemented
OR0622 # 03 Y:2013 03 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,423 $20,917 Not Implemented
OR0622 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,279 $15,410 Not Implemented
OR0617 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,239 $20,000 Implemented
OR0617 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,455 $4,610 Implemented
OR0617 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $21,219 $131,114 Implemented
OR0617 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,848 $60,000 Implemented
OR0617 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,516 $13,850 Implemented
OR0617 # 06 Y:2013 06 2013 OPTIMIZE PLANT POWER FACTOR $8,494 $35,187 Implemented
OR0617 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,023 $11,440 Not Implemented
OR0617 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $237,215 $2,000,000 Not Implemented
OR0616 # 01 Y:2013 01 2013 INSTALL SENSORS TO DETECT DEFECTS $145,630 $200 Implemented
OR0616 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $6,100 Implemented
OR0616 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $2,727 $11,025 Not Implemented
OR0616 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $750 Implemented
OR0607 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,535 $27,268 Not Implemented
OR0607 # 02 Y:2013 02 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,626 $5,352 Not Implemented
OR0607 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $3,603 $9,150 Not Implemented
OR0607 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,983 $7,504 Implemented
OR0607 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,021 $5,130 Implemented
OR0602 # 01 Y:2013 01 2013 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $199,441 $59,312 Implemented
OR0602 # 02 Y:2013 02 2013 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $17,131 $45,000 Not Implemented
OR0602 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $14,855 $19,467 Implemented
OR0602 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $5,434 $10,283 Implemented
OR0602 # 05 Y:2013 05 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,904 $4,472 Not Implemented