Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
257
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0145 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,842 | $306 | Not Implemented |
BS0145 # 03 Y:2021 | 03 | 2021 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $46,312 | $106,140 | Not Implemented |
BS0145 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,246 | $3,700 | Not Implemented |
BS0145 # 02 Y:2021 | 02 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,250 | $6,500 | Not Implemented |
BS0145 # 04 Y:2021 | 04 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $22,793 | $7,115 | Not Implemented |
BS0141 # 06 Y:2020 | 06 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,736 | $27,300 | Not Implemented |
BS0141 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $68 | $55 | Not Implemented |
BS0141 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,407 | $70,150 | Not Implemented |
BS0141 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $1,100 | Not Implemented |
BS0141 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $3,300 | Not Implemented |
BS0141 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,094 | $50 | Not Implemented |
BS0122 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,341 | $1,630 | Not Implemented |
BS0122 # 04 Y:2019 | 04 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $882 | $15 | Not Implemented |
BS0122 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,031 | $14,455 | Not Implemented |
BS0122 # 06 Y:2019 | 06 | 2019 | BURN A LESS EXPENSIVE GRADE OF FUEL | $105,689 | $93,600 | Not Implemented |
BS0122 # 07 Y:2019 | 07 | 2019 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $322,973 | $1,002,400 | Not Implemented |
BS0122 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,702 | $8,000 | Not Implemented |
BS0122 # 05 Y:2019 | 05 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,219 | $5,725 | Not Implemented |
BS0112 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,787 | $13,000 | Not Implemented |
BS0112 # 06 Y:2018 | 06 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,051 | $2,790 | Not Implemented |
BS0112 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,971 | $2,145 | Not Implemented |
BS0112 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,785 | $1,560 | Not Implemented |
BS0112 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,656 | $1,031 | Not Implemented |
BS0112 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,983 | $1,500 | Not Implemented |
BS0110 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $577 | $138 | Not Implemented |