Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2421 | Sawmills And Planing Mills, General |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0500 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,264 | $2,000 | Implemented |
MA0500 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $14,725 | $35,000 | Implemented |
ME0298 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,392 | $340 | Implemented |
ME0298 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,240 | $66,900 | Implemented |
ME0291 # 06 Y:2000 | 06 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $694 | $160 | Implemented |
ME0291 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,828 | $160 | Implemented |
ME0291 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,294 | $4,112 | Implemented |
ME0271 # 09 Y:1999 | 09 | 1999 | METER WASTE WATER | $1,684 | $200 | Implemented |
ME0271 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $224 | $100 | Implemented |
ME0271 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $366 | $407 | Implemented |
ME0271 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,248 | $150 | Implemented |
ME0271 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,694 | $11,058 | Implemented |
ME0271 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,060 | $47,675 | Implemented |
ME0244 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,514 | $11,502 | Implemented |
ME0244 # 04 Y:1998 | 04 | 1998 | REPAIR AND ELIMINATE STEAM LEAKS | $1,150 | $150 | Implemented |
ME0244 # 06 Y:1998 | 06 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,182 | $1,280 | Implemented |
ME0244 # 07 Y:1998 | 07 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $647 | $0 | Implemented |
ME0183 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,553 | $10,500 | Implemented |
ME0183 # 10 Y:1996 | 10 | 1996 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,107 | $0 | Implemented |
ME0183 # 09 Y:1996 | 09 | 1996 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,133 | $0 | Implemented |
ME0183 # 08 Y:1996 | 08 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,000 | $9,500 | Implemented |
ME0183 # 07 Y:1996 | 07 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,206 | $6,000 | Implemented |
ME0183 # 06 Y:1996 | 06 | 1996 | UPGRADE CONVEYORS | $5,339 | $6,100 | Implemented |
ME0183 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,901 | $13,040 | Implemented |
ME0183 # 04 Y:1996 | 04 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,809 | $0 | Implemented |