IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0757 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,924 $500 Implemented
MA0757 # 01 Y:2016 01 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $95,137 $37,800 Implemented
MA0718 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $200 Implemented
MA0718 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $809 $1,400 Implemented
MA0718 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,029 $1,000 Implemented
MA0496 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $846 $3,000 Implemented
MA0496 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $73 $400 Implemented
MA0496 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,090 $1,100 Implemented
MA0496 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,200 $0 Implemented
MA0496 # 01 Y:2001 01 2001 RECOVER MECHANICAL ENERGY $9,000 $40,000 Implemented
MA0497 # 02 Y:2001 02 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $22,000 $50,000 Implemented
MA0497 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,298 $17,500 Implemented
MA0497 # 07 Y:2001 07 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,951 $1,200 Implemented
MA0497 # 10 Y:2001 10 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,424 $2,000 Implemented
MA0497 # 11 Y:2001 11 2001 INSULATE BARE EQUIPMENT $1,408 $800 Implemented
MA0497 # 12 Y:2001 12 2001 OPTIMIZE PLANT POWER FACTOR $1,325 $4,500 Implemented
MA0494 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $759 $0 Implemented
MA0494 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $2,700 Implemented
MA0494 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,346 $19,000 Implemented
MA0494 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,732 $5,000 Implemented
MA0478 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,350 $5,500 Implemented
MA0478 # 10 Y:2000 10 2000 INSTALL OCCUPANCY SENSORS $320 $450 Implemented
MA0478 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $550 Implemented
MA0478 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,960 $0 Implemented
MA0478 # 04 Y:2000 04 2000 INSULATE FEEDWATER TANK $3,300 $2,500 Implemented