Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,907
matching recommendationsSIC | 2421 | Sawmills And Planing Mills, General |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0242 # 03 Y:2002 | 03 | 2002 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,620 | $4,870 | Implemented |
WV0242 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $871 | $116 | Not Implemented |
WV0242 # 05 Y:2002 | 05 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,564 | $128 | Implemented |
WV0242 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $456 | $72 | Implemented |
WV0242 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $304 | $0 | Implemented |
WV0242 # 08 Y:2002 | 08 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,335 | $900 | Implemented |
WV0242 # 09 Y:2002 | 09 | 2002 | BURN WASTE OIL FOR HEAT | $5,537 | $4,000 | Not Implemented |
WV0242 # 10 Y:2002 | 10 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $864 | $400 | Implemented |
WV0242 # 11 Y:2002 | 11 | 2002 | INSTALL SENSORS TO DETECT DEFECTS | $127,500 | $13,480 | Not Implemented |
WV0242 # 12 Y:2002 | 12 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $28,000 | $12,000 | Not Implemented |
NC0236 # 01 Y:2002 | 01 | 2002 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,684 | $6,000 | Not Implemented |
NC0236 # 02 Y:2002 | 02 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $4,419 | $8,200 | Implemented |
NC0236 # 03 Y:2002 | 03 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $19,606 | $550 | Not Implemented |
NC0236 # 04 Y:2002 | 04 | 2002 | USE PHOTOCELL CONTROLS | $115 | $260 | Implemented |
LL0141 # 01 Y:2002 | 01 | 2002 | USE POWER DURING OFF-PEAK PERIODS | $189,217 | $0 | Implemented |
LL0141 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,007 | $2,985 | Implemented |
LL0141 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $15,140 | $23,730 | Not Implemented |
LL0141 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,695 | $1,485 | Implemented |
LL0141 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,273 | $0 | Not Implemented |
LL0141 # 06 Y:2002 | 06 | 2002 | USE PHOTOCELL CONTROLS | $2,062 | $51 | Not Implemented |
GT0733 # 01 Y:2002 | 01 | 2002 | COMBINE UTILITY METERS | $13,100 | $1,000 | Not Implemented |
GT0733 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,343 | $49,000 | Not Implemented |
GT0733 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $56,762 | $237,300 | Not Implemented |
GT0733 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $22,495 | $2,500 | Not Implemented |
GT0733 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,965 | $14,670 | Not Implemented |