IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,121

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0538 # 04 Y:2019 04 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,964 $6,180 Implemented
UF0538 # 03 Y:2019 03 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,027 $7,692 Implemented
UF0538 # 02 Y:2019 02 2019 INSTALL SKYLIGHTS $11,989 $45,500 Implemented
UF0538 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,744 $52,547 Implemented
IP0120 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $691 $3,215 Implemented
IP0120 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,019 $4,963 Implemented
IP0120 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $473 $256 Implemented
IP0120 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $22 Implemented
IP0120 # 02 Y:2019 02 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $835 $0 Implemented
IP0120 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,145 $4 Implemented
MZ0273 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,353 $80 Implemented
MZ0273 # 08 Y:2019 08 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,304 $390 Implemented
MZ0273 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $3,070 Implemented
MZ0273 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $2,794 $630 Implemented
MZ0273 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,687 $1,800 Implemented
MZ0273 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,770 $3,200 Implemented
MZ0273 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,986 $1,880 Implemented
NC0632 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $360 Implemented
NC0632 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $357 $500 Implemented
NC0632 # 05 Y:2019 05 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,288 $500 Implemented
NC0628 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $200 Implemented
NC0610 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $1,934 $5,865 Implemented
NC0610 # 06 Y:2018 06 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,484 $10,000 Implemented
NC0610 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,293 $10,000 Implemented
NC0610 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,172 $200 Implemented