Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,179
matching recommendationsSIC | 2431 | Millwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ND0335 # 07 Y:1999 | 07 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $51 | $50 | Implemented |
AS0260 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,960 | $8,259 | n/a |
AS0260 # 02 Y:1999 | 02 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,591 | $1,300 | n/a |
AS0260 # 03 Y:1999 | 03 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,200 | $7,600 | n/a |
AS0260 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $423 | $60 | n/a |
AS0260 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,157 | $240 | n/a |
AS0260 # 06 Y:1999 | 06 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,639 | $1,060 | n/a |
AS0260 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,300 | $30 | n/a |
AS0260 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $970 | $0 | n/a |
IA0225 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,393 | $381 | Implemented |
IA0225 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,198 | $9,000 | Not Implemented |
IA0225 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $988 | $0 | Implemented |
IA0225 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $265 | $189 | Implemented |
IA0225 # 05 Y:1999 | 05 | 1999 | INSTALL OCCUPANCY SENSORS | $189 | $798 | Not Implemented |
IA0225 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $13 | Implemented |
IA0225 # 07 Y:1999 | 07 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,120 | $2,500 | Not Implemented |
IA0225 # 08 Y:1999 | 08 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $6,890 | $12,000 | Not Implemented |
UL0225 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $22,666 | $14,656 | Implemented |
UL0225 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $742 | $65 | Not Implemented |
UL0225 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $135,070 | $761,380 | Not Implemented |
UL0225 # 04 Y:1999 | 04 | 1999 | ADOPT IN-HOUSE MATERIAL GENERATION | $136,000 | $143,925 | Not Implemented |
IA0217 # 01 Y:1999 | 01 | 1999 | REPLACE BOILER | $22,643 | $12,000 | Not Implemented |
IA0217 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,292 | $2,306 | Implemented |
IA0217 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,488 | $231 | Implemented |
IA0217 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $370 | $1,417 | Not Implemented |