IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
SIC 2436 Softwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0761 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $31,013 $150,000 Not Implemented
OR0761 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,236 $26,406 Not Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0727 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,255 $770 Implemented
OR0727 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,870 $19,006 Implemented
OR0727 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $125,609 $904,500 Not Implemented
OR0727 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,245,906 $300,000 Not Implemented
OR0635 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $40,819 $43,800 Not Implemented
OR0635 # 06 Y:2014 06 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $181,002 $170,561 Not Implemented
OR0635 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,961 $9,068 Not Implemented
OR0635 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,844 $15,843 Not Implemented
OR0635 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $56,191 $56,191 Not Implemented
OR0635 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,287 $1,628 Not Implemented
OR0635 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,475 $7,174 Not Implemented
OR0633 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,929 $4,920 Not Implemented
OR0633 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,456 $1,771 Not Implemented
OR0633 # 02 Y:2014 02 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $392,710 $105,114 Not Implemented
OR0633 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $107,219 $4,630 Not Implemented
OR0581 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,161 $1,000 Not Implemented
OR0581 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $30,460 $37,511 Not Implemented
OR0581 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,590 $16,590 Not Implemented
OR0581 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,488 $6,761 Not Implemented
OR0581 # 04 Y:2012 04 2012 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,155 $7,334 Not Implemented
OR0581 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $27,601 $81,000 Not Implemented