IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

237

matching recommendations
Reset
SIC 245 Wood Buildings And Mobile Homes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0519 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $3,455 Implemented
AS0519 # 05 Y:2022 05 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,322 $7,738 Implemented
AS0519 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,189 $17,273 Implemented
AS0519 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $830 Implemented
AS0519 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $65,138 $509,120 Implemented
AS0519 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,335 $11,420 Implemented
UF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,163 $0 Implemented
UF0563 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $951 $0 Implemented
UF0563 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,895 $3,125 Implemented
UF0563 # 05 Y:2020 05 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,582 $735 Implemented
UF0563 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $406 Implemented
OR0722 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,047 $1,000 Implemented
OR0722 # 02 Y:2019 02 2019 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $17,875 $0 Implemented
OR0722 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,107 $0 Implemented
MA0807 # 05 Y:2019 05 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,241 $5,413 Implemented
MA0807 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,356 $9,356 Implemented
MA0807 # 01 Y:2019 01 2019 REDUCE VENTILATION AIR $10,917 $100 Implemented
MA0807 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $558 $470 Implemented
BS0090 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,027 $1,820 Implemented
BS0090 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $395 $254 Implemented
BS0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $2,653 Implemented
BS0090 # 04 Y:2016 04 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $942 $1,373 Implemented
BS0082 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $1,327 $3,476 Implemented
BS0082 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $300 Implemented
BS0082 # 05 Y:2016 05 2016 REDESIGN PROCESS $1,906 $1,953 Implemented