IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

316

matching recommendations
Reset
SIC 2499 Wood Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0181 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,431 $2,000 Implemented
BD0250 # 12 Y:2004 12 2004 MINIMIZE WATER USAGE $1,076 $690 Implemented
BD0250 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $1,080 Implemented
BD0250 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,778 $444 Implemented
BD0250 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,047 $2,175 Implemented
BD0250 # 04 Y:2004 04 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,816 $6,800 Implemented
BD0250 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,569 $15,260 Implemented
BD0250 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $34,795 $2,160 Implemented
NC0273 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $879 $390 Implemented
NC0273 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $65 $0 Implemented
NC0273 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $83 Implemented
AS0365 # 06 Y:2003 06 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $274 $350 Implemented
AS0365 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,328 $60 Implemented
AS0365 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,535 Implemented
AS0365 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $790 $1,643 Implemented
AM0444 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $460 $200 Implemented
AM0444 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,800 $0 Implemented
AM0444 # 03 Y:2003 03 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $80 Implemented
SU0139 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,623 $2,160 Implemented
SU0139 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,186 $138 Implemented
UD0647 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,090 $400 Implemented
UD0647 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,899 $0 Implemented
UD0647 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,799 $2,324 Implemented
UD0647 # 02 Y:2002 02 2002 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $8,910 $0 Implemented
ME0305 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $15,000 $41,800 Implemented