IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0542 # 07 Y:2017 07 2017 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,935 $1,833 Not Implemented
SD0483 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,633 $2,600 Implemented
SD0483 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,563 $3,243 Implemented
SD0483 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,486 $2,845 Implemented
SD0483 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,147 $500 Implemented
SD0483 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $7,108 $21,254 Not Implemented
SD0483 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $783 $500 Implemented
SD0483 # 01 Y:2014 01 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,026 $61,400 Implemented
SD0507 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,615 $5,000 Not Implemented
SD0507 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,820 $2,500 Not Implemented
SD0507 # 01 Y:2011 01 2011 USE PHOTOCELL CONTROLS $152 $0 Implemented
SD0507 # 04 Y:2011 04 2011 INSULATE FEEDWATER TANK $443 $400 Not Implemented
SD0507 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,758 $7,385 Not Implemented
SD0507 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $983 Implemented
SD0380 # 05 Y:2006 05 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $459 $3,193 Not Implemented
SD0380 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,026 $3,850 Not Implemented
SD0380 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,495 $4,550 Not Implemented
SD0380 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,418 $2,325 Not Implemented
SD0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $220 Not Implemented
LM0105 # 05 Y:2006 05 2006 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,978 $1,000 Implemented
LM0105 # 04 Y:2006 04 2006 DEVELOP STANDARD OPERATING PROCEDURES $48,035 $1,500 Implemented
LM0105 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,197 $250 Implemented
LM0105 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,156 $960 Implemented
LM0105 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $0 Not Implemented
SD0374 # 05 Y:2005 05 2005 COVER OPEN TANKS $2,000 $4,500 Not Implemented