IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2521 Wood Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0591 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,408 $87,579 Implemented
SU0406 # 07 Y:2016 07 2016 REPLACE BOILER $8,344 $37,133 Implemented
SU0406 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $226 $287 Implemented
SU0406 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $337 Implemented
SU0406 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $0 Implemented
SU0406 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,885 $0 Implemented
SU0406 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $126 $145 Implemented
WM0073 # 16 Y:2015 16 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $125 Implemented
WM0073 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,673 $334 Implemented
WM0073 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,390 $4,800 Implemented
WM0073 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,049 $132 Implemented
WM0073 # 12 Y:2015 12 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,070 $391 Implemented
WM0073 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $288 $100 Implemented
WM0073 # 13 Y:2015 13 2015 USE SYNTHETIC LUBRICANT $654 $1,155 Implemented
WM0073 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $423 $380 Implemented
SU0391 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $938 $1,414 Implemented
SU0391 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $716 $367 Implemented
SU0391 # 01 Y:2015 01 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $9,598 $5,243 Implemented
UA0094 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,762 $41,601 Implemented
UA0094 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,165 $800 Implemented
UA0094 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $13,800 $8,100 Implemented
UA0094 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,212 $16,350 Implemented
UA0094 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,672 $4,500 Implemented
UA0094 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $4,500 Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented