IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2521 Wood Office Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0045 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented
UD0772 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,297 $3,275 Implemented
UD0772 # 01 Y:2007 01 2007 MODIFY STARTUP/SHUTDOWN TIMES $144,431 $0 Implemented
UD0772 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,082 $161,076 Implemented
UD0772 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,540 $58,765 Implemented
UD0772 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $7,421 $17,000 Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
SU0169 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Implemented
SU0169 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,040 $348 Implemented
SU0169 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $26 Implemented
SU0169 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $168 Implemented
TA0055 # 05 Y:2003 05 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,360 $0 Implemented
TA0055 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $68,000 $0 Implemented
TA0055 # 02 Y:2003 02 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $36,000 $31,820 Implemented
TA0055 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $910 Implemented
TA0055 # 10 Y:2003 10 2003 COVER OPEN TANKS $100 $0 Implemented
TA0055 # 07 Y:2003 07 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,675 $1,000 Implemented
TA0055 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,100 $46 Implemented
MI0052 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,165 $3,837 Implemented
MI0052 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $233,064 $48,450 Implemented
MS0211 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $675 $472 Implemented
MS0211 # 05 Y:2002 05 2002 DISCONNECT BALLASTS $442 $255 Implemented