IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
SIC 254 Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0164 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $56,600 $384,000 Implemented
MZ0164 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,302 $25,000 Implemented
MZ0164 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $24,203 $100,000 Implemented
MZ0164 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,593 $6,500 Implemented
MZ0164 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,200 $1,430 Implemented
MZ0164 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $71,454 $0 Implemented
MZ0164 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $188,887 $0 Implemented
NC0500 # 10 Y:2013 10 2013 METER WASTE WATER $4,155 $4,200 Implemented
NC0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,389 $7,000 Implemented
NC0500 # 12 Y:2013 12 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,622 $775 Implemented
NC0500 # 02 Y:2013 02 2013 MAKE A NEW BY-PRODUCT $86,815 $250,000 Implemented
NC0500 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $100 Implemented
NC0500 # 04 Y:2013 04 2013 REDUCE FLUID FLOW RATES $34,287 $18,000 Implemented
NC0500 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,293 $125 Implemented
NC0500 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $875 Implemented
NC0500 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $4,146 $200 Implemented
SD0507 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $983 Implemented
SD0507 # 01 Y:2011 01 2011 USE PHOTOCELL CONTROLS $152 $0 Implemented
BD0380 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,928 $11 Implemented
CO0628 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,150 $4,590 Implemented
CO0628 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,050 $1,730 Implemented
CO0628 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,830 $890 Implemented
CO0628 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $21,150 Implemented
CO0628 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,830 $12,240 Implemented
LE0266 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $42,137 $2,614 Implemented