IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,654

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0583 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,430 $2,300 Implemented
LE0583 # 03 Y:2024 03 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $344,366 $63,000 Implemented
LE0583 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,014 $7,000 Implemented
MU0053 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $1,958 Implemented
MU0053 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,196 $1,904 Implemented
MU0053 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,429 $4,900 Implemented
MU0053 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $865 $512 Implemented
MU0053 # 11 Y:2024 11 2024 INSTALL TIMERS AND/OR THERMOSTATS $473 $140 Implemented
MU0053 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $79,472 $58,598 Implemented
MU0053 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $439 $51 Implemented
NT0029 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,227 $1,819 Implemented
NT0029 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,550 $21,900 Implemented
NT0029 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,179 $5,609 Implemented
NT0029 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $204,971 $10,000 Implemented
NT0023 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $5,609 Implemented
NT0023 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,182 $16,564 Implemented
NT0023 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $7,720 $0 Implemented
UF0612 # 06 Y:2024 06 2024 INSTALL TURBULATORS $13,749 $3,750 Implemented
UF0612 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,994 $20,000 Implemented
UF0612 # 08 Y:2024 08 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,481 $5,900 Implemented
UF0612 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,066 $2,320 Implemented
UF0612 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,735 $34,020 Implemented
UF0612 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,865 $8,523 Implemented
UF0612 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $55,068 $30,945 Implemented
WV0658 # 01 Y:2024 01 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $46,042 $4,000 Implemented