IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0707 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,639 $6,750 Implemented
BD0284 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,372 $800 Implemented
BD0284 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,583 $18,820 Implemented
BD0284 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,801 $1,464 Implemented
BD0284 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $360 Implemented
BD0284 # 06 Y:2005 06 2005 USE RADIANT HEATER FOR SPOT HEATING $7,427 $4,800 Implemented
BD0284 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $967 $900 Implemented
BD0284 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $3,546 $2,240 Implemented
WV0314 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,732 $3,713 Implemented
WV0314 # 02 Y:2005 02 2005 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,277 $70 Implemented
WV0314 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,828 $0 Implemented
WV0314 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $605 Implemented
WV0314 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,552 $404 Implemented
WV0314 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $105 Implemented
WV0314 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $406 $96 Implemented
LE0211 # 01 Y:2005 01 2005 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,318 $23,385 Implemented
LE0211 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $16,472 Implemented
SU0207 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Implemented
SU0207 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $477 Implemented
SU0207 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $55 $92 Implemented
LM0094 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $500 Implemented
LM0094 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,502 $983 Implemented
LM0094 # 03 Y:2005 03 2005 $57,780 $50,000 Implemented
UM0276 # 01 Y:2005 01 2005 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $206,100 $96,000 Implemented
UM0276 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,572 $2,500 Implemented