IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0211 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $718 $100 Implemented
UM0211 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $543 $500 Implemented
UM0211 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $375 Implemented
UM0211 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $383 $600 Implemented
WV0236 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,180 $4,900 Implemented
WV0236 # 02 Y:2002 02 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $826 $585 Implemented
WV0236 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $37,820 $422 Implemented
WV0236 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,340 $84 Implemented
WV0236 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,206 $3,600 Implemented
WV0236 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,272 $750 Implemented
WV0236 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,994 $560 Implemented
SF0233 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,975 $0 Implemented
UF0294 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $2,667 $654 Implemented
UF0294 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,905 $4,220 Implemented
UF0294 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,603 $14,749 Implemented
UF0294 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $0 Implemented
UF0294 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,700 $7,000 Implemented
UF0294 # 10 Y:2002 10 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $8,320 $32,000 Implemented
BD0204 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,268 $2,000 Implemented
BD0204 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,628 $2,850 Implemented
BD0204 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $364 $1,200 Implemented
BD0204 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $223 Implemented
MI0027 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,448 $1,859 Implemented
MI0027 # 03 Y:2002 03 2002 MODIFY STARTUP/SHUTDOWN TIMES $150,000 $3,900 Implemented
IC0029 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $1,907 $3,610 Implemented