IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0029 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,179 $1,500 Implemented
IC0029 # 06 Y:2002 06 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,712 $36,036 Implemented
IC0029 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,616 $906 Implemented
MI0027 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,448 $1,859 Implemented
MI0027 # 03 Y:2002 03 2002 MODIFY STARTUP/SHUTDOWN TIMES $150,000 $3,900 Implemented
AS0319 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,641 $7,690 Implemented
IA0286 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,555 $434 Implemented
IA0286 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,616 $250 Implemented
IA0286 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,465 $16,361 Implemented
IA0286 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $0 Implemented
IA0286 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,270 $1,500 Implemented
IA0286 # 08 Y:2002 08 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $2,691 $1,000 Implemented
GT0725 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $43,102 $10,500 Implemented
GT0725 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,446 $2,550 Implemented
GT0725 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,301 $10,007 Implemented
GT0725 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,114 $400 Implemented
GT0725 # 08 Y:2002 08 2002 FILTER AND REUSE HYDRAULIC OIL $1,900 $0 Implemented
LM0026 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,166 $1,152 Implemented
LM0026 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $6,152 $4,400 Implemented
LM0026 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,384 $900 Implemented
LM0026 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $250 Implemented
LM0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,396 $0 Implemented
TA0023 # 01 Y:2002 01 2002 PAY UTILITY BILLS ON TIME $5,506 $0 Implemented
TA0023 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $270 $0 Implemented
TA0023 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $468 Implemented