IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0829 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $5,100 Implemented
MA0829 # 06 Y:2022 06 2022 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,891 $4,445 Implemented
MA0829 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,700 $4,400 Implemented
MA0819 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,022 $217,000 Implemented
MA0792 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,850 $16,551 Implemented
MA0792 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,711 $9,925 Implemented
MA0791 # 04 Y:2018 04 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $974 $1,000 Implemented
MA0791 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $1,313 $238 Implemented
MA0710 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,966 $10,580 Implemented
MA0710 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,915 $10,580 Implemented
MA0710 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,115 $2,705 Implemented
MA0697 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $10,370 $3,000 Implemented
MA0697 # 05 Y:2012 05 2012 PAY UTILITY BILLS ON TIME $11,678 $500 Implemented
MA0697 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $3,600 Implemented
MAS019 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,186 $1,500 Implemented
MAS019 # 04 Y:2012 04 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,117 $0 Implemented
MAS019 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $375 $0 Implemented
MA0684 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $14,891 $3,700 Implemented
MA0684 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,358 $15,000 Implemented
MA0684 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,402 $2,100 Implemented
MA0684 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $23,122 $40,000 Implemented
MA0684 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,502 $2,200 Implemented
MA0675 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,590 $950 Implemented
MA0631 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $200 Implemented
MA0631 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,021 $0 Implemented