Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0829 # 07 Y:2022 | 07 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,594 | $5,100 | Implemented |
MA0829 # 06 Y:2022 | 06 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,891 | $4,445 | Implemented |
MA0829 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,700 | $4,400 | Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
MA0792 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,850 | $16,551 | Implemented |
MA0792 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,711 | $9,925 | Implemented |
MA0791 # 04 Y:2018 | 04 | 2018 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $974 | $1,000 | Implemented |
MA0791 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $1,313 | $238 | Implemented |
MA0710 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,966 | $10,580 | Implemented |
MA0710 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,915 | $10,580 | Implemented |
MA0710 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,115 | $2,705 | Implemented |
MA0697 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $10,370 | $3,000 | Implemented |
MA0697 # 05 Y:2012 | 05 | 2012 | PAY UTILITY BILLS ON TIME | $11,678 | $500 | Implemented |
MA0697 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,779 | $3,600 | Implemented |
MAS019 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,186 | $1,500 | Implemented |
MAS019 # 04 Y:2012 | 04 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,117 | $0 | Implemented |
MAS019 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $375 | $0 | Implemented |
MA0684 # 02 Y:2011 | 02 | 2011 | REDUCE VENTILATION AIR | $14,891 | $3,700 | Implemented |
MA0684 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,358 | $15,000 | Implemented |
MA0684 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,402 | $2,100 | Implemented |
MA0684 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,122 | $40,000 | Implemented |
MA0684 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $2,502 | $2,200 | Implemented |
MA0675 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $2,590 | $950 | Implemented |
MA0631 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $350 | $200 | Implemented |
MA0631 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,021 | $0 | Implemented |