IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0076 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $281 Implemented
LM0076 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,953 $3,825 Not Implemented
LM0076 # 05 Y:2004 05 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,736 $2,500 Implemented
LM0076 # 06 Y:2004 06 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,766 $1,500 Not Implemented
LM0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $880 Implemented
GT0782 # 01 Y:2004 01 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,120 $5,800 Not Implemented
GT0782 # 02 Y:2004 02 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $9,340 $2,000 Not Implemented
GT0782 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $7,210 $3,000 Not Implemented
GT0782 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $2,145 Implemented
GT0782 # 05 Y:2004 05 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,625 $200 Implemented
GT0782 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $450 Implemented
GT0782 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $2,340 Implemented
SD0332 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $164,104 $609,600 Not Implemented
SD0332 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,679 $475 Implemented
SD0332 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,765 $900 Implemented
SD0332 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,750 $6,000 Not Implemented
SD0332 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $3,460 $7,015 Not Implemented
WI0468 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $124,013 $650,000 Not Implemented
WI0468 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,024 $103,390 Implemented
WI0468 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $673 $150 Implemented
WI0468 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,655 $13,500 Not Implemented
WI0468 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,209 $16,500 Implemented
WI0468 # 06 Y:2004 06 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,113 $10,500 Not Implemented
WI0468 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,043 $1,280 Implemented
WI0468 # 08 Y:2004 08 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,932 $360 Not Implemented