Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
364
matching recommendationsSIC | 262 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0684 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,358 | $15,000 | Implemented |
MA0684 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $2,502 | $2,200 | Implemented |
MA0684 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $1,402 | $2,100 | Implemented |
MAS013 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $21,255 | $20,475 | Implemented |
MAS013 # 03 Y:2011 | 03 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,053 | $0 | Implemented |
MAS013 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $3,878 | $3,600 | Implemented |
MAS013 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,738 | $8,000 | Implemented |
MAS013 # 07 Y:2011 | 07 | 2011 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $2,115 | $150 | Implemented |
MAS013 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $784 | $3,500 | Implemented |
MA0675 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $2,590 | $950 | Implemented |
LL0333 # 01 Y:2010 | 01 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,585,020 | $273,500 | Implemented |
LL0333 # 02 Y:2010 | 02 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $288,465 | $36,500 | Implemented |
LL0333 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $3,966 | $5,315 | Implemented |
SU0297 # 11 Y:2010 | 11 | 2010 | UPGRADE OBSOLETE EQUIPMENT | $1,054 | $4,725 | Implemented |
SU0297 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,058 | $45,795 | Implemented |
SU0297 # 08 Y:2010 | 08 | 2010 | OPTIMIZE PLANT POWER FACTOR | $18,693 | $24,129 | Implemented |
SU0297 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,260 | $650 | Implemented |
SU0297 # 05 Y:2010 | 05 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $29,835 | $5,275 | Implemented |
SU0297 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,458 | $697 | Implemented |
SU0297 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,345 | $0 | Implemented |
MI0188 # 01 Y:2010 | 01 | 2010 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $500,499 | $0 | Implemented |
MI0188 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $42,782 | $60 | Implemented |
MI0188 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,420 | $920 | Implemented |
MI0188 # 06 Y:2010 | 06 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,600 | $1,920 | Implemented |
MI0188 # 08 Y:2010 | 08 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,050 | $2,904 | Implemented |