IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0494 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $0 Implemented
IA0283 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $878 $258 Implemented
IA0283 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $569 $34 Implemented
IA0283 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,046 $509 Implemented
IA0283 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $0 Implemented
IA0283 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $354 $17 Implemented
IA0283 # 08 Y:2001 08 2001 INSTALL TURBULATORS $982 $912 Implemented
IA0283 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $207,700 $60,000 Implemented
TA0014 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,969 $1,900 Implemented
TA0014 # 02 Y:2001 02 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $8,100 $11,960 Implemented
TA0014 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,675 $170 Implemented
TA0014 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $1,516 $320 Implemented
TA0014 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $989 Implemented
TA0014 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $345 Implemented
WV0221 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,200 $3,420 Implemented
WV0221 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $394 $60 Implemented
WV0221 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $8,016 $866 Implemented
WV0221 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $11,836 $8,422 Implemented
WV0221 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,579 $1,200 Implemented
WV0221 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,330 $3,980 Implemented
WV0221 # 07 Y:2001 07 2001 REPAIR OR REPLACE STEAM TRAPS $14,790 $1,000 Implemented
WV0221 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,986 $600 Implemented
WV0221 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,038 $2,000 Implemented
IA0272 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,710 $356 Implemented
IA0272 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $612 $60 Implemented