Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0556 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $13,042 | $6,750 | Implemented |
MA0556 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,534 | $529 | Implemented |
MA0556 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,720 | $10,350 | Implemented |
MA0556 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,840 | $2,131 | Implemented |
MA0556 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,167 | $10,200 | Implemented |
MA0533 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,624 | $6,120 | Implemented |
MA0533 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $8,645 | $3,215 | Implemented |
MA0533 # 03 Y:2003 | 03 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $10,803 | $25,625 | Implemented |
MA0533 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,098 | $1,090 | Implemented |
MA0533 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,140 | $15,455 | Implemented |
MA0522 # 07 Y:2002 | 07 | 2002 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,709 | $1,000 | Implemented |
MA0482 # 09 Y:2001 | 09 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,040 | $450 | Implemented |
MA0465 # 02 Y:2000 | 02 | 2000 | OPTIMIZE PLANT POWER FACTOR | $4,076 | $4,125 | Implemented |
MA0465 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $845 | $528 | Implemented |
MA0465 # 05 Y:2000 | 05 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $605 | $400 | Implemented |
MA0399 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $75 | Implemented |
MA0206 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $20,259 | $14,186 | Implemented |
MA0206 # 02 Y:1991 | 02 | 1991 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $10,773 | $45,415 | Implemented |
MA0206 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $498 | $145 | Implemented |
MA0206 # 04 Y:1991 | 04 | 1991 | INSTALL SET-BACK TIMERS | $864 | $473 | Implemented |
MA0206 # 05 Y:1991 | 05 | 1991 | TURN OFF EQUIPMENT WHEN NOT IN USE | $742 | $0 | Implemented |
MA0075 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,271 | $119 | Implemented |
MA0075 # 06 Y:1986 | 06 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $789 | $800 | Implemented |
MA0075 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $1,075 | Implemented |
MA0075 # 08 Y:1986 | 08 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,014 | $7,500 | Implemented |