IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0556 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $13,042 $6,750 Implemented
MA0556 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,167 $10,200 Implemented
MA0556 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,534 $529 Implemented
MA0556 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,131 Implemented
MA0556 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,720 $10,350 Implemented
MA0533 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,098 $1,090 Implemented
MA0533 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,624 $6,120 Implemented
MA0533 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $5,140 $15,455 Implemented
MA0533 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $8,645 $3,215 Implemented
MA0533 # 03 Y:2003 03 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $10,803 $25,625 Implemented
MA0522 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,709 $1,000 Implemented
MA0482 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $450 Implemented
MA0465 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $605 $400 Implemented
MA0465 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $4,076 $4,125 Implemented
MA0465 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $845 $528 Implemented
MA0399 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $667 $75 Implemented
MA0206 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $742 $0 Implemented
MA0206 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $864 $473 Implemented
MA0206 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $498 $145 Implemented
MA0206 # 02 Y:1991 02 1991 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,773 $45,415 Implemented
MA0206 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $20,259 $14,186 Implemented
MA0075 # 08 Y:1986 08 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $7,500 Implemented
MA0075 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $800 Implemented
MA0075 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,271 $119 Implemented
MA0075 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $565 $1,136 Implemented