IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0309 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $518 $13 Implemented
IA0309 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $758 $1,900 Implemented
IA0309 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,309 $456 Implemented
IA0272 # 11 Y:2001 11 2001 MINIMIZE WATER USAGE $1,414 $35 Implemented
IA0272 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,313 $1,862 Implemented
IA0272 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $612 $60 Implemented
IA0272 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,710 $356 Implemented
IA0272 # 09 Y:2001 09 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,544 $445 Implemented
IA0215 # 09 Y:1999 09 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $264 $102 Implemented
IA0215 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $294 $1,264 Implemented
IA0215 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $2,184 Implemented
IA0215 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,498 $11,043 Implemented
IA0215 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,587 $2,500 Implemented
IA0215 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,169 $382 Implemented
IA0090 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $19,385 $17,738 Implemented
IA0090 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,489 $500 Implemented
IA0090 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,368 $1,803 Implemented
IA0090 # 06 Y:1994 06 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,490 $12,600 Implemented
IA0090 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $918 $373 Implemented
IA0074 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $9,807 $12,405 Implemented
IA0074 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,641 $1,900 Implemented
IA0074 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $3,511 $1,800 Implemented
IA0041 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $81 $188 Implemented
IA0041 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,582 $1,106 Implemented
IA0041 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $8,582 $3,000 Implemented