Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 2653 | Corrugated And Solid Fiber Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0125 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,087 | $2,215 | Implemented |
WM0125 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $293 | $0 | Implemented |
IC0176 # 07 Y:2010 | 07 | 2010 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,677 | $40,071 | Implemented |
IC0176 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $205 | $0 | Implemented |
IC0176 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,067 | $1,035 | Implemented |
WI0511 # 05 Y:2006 | 05 | 2006 | USE SYNTHETIC LUBRICANT | $2,149 | $0 | Implemented |
WI0511 # 04 Y:2006 | 04 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,712 | $0 | Implemented |
WI0511 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,167 | $8,820 | Implemented |
WI0511 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $8,256 | $850 | Implemented |
WI0511 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $640 | Implemented |
WI0511 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $283 | $150 | Implemented |
WI0511 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $446 | $0 | Implemented |
WI0511 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $263 | $0 | Implemented |
WI0468 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,043 | $1,280 | Implemented |
WI0468 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,209 | $16,500 | Implemented |
WI0468 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $673 | $150 | Implemented |
WI0468 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,024 | $103,390 | Implemented |
WI0448 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $610 | $300 | Implemented |
WI0448 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,587 | $13,005 | Implemented |
WI0430 # 06 Y:2002 | 06 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $689 | $39 | Implemented |
WI0430 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $741 | $0 | Implemented |
WI0043 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,890 | $4,906 | Implemented |
WI0043 # 07 Y:1988 | 07 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,343 | $6,900 | Implemented |
WI0043 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,056 | $500 | Implemented |
WI0043 # 05 Y:1988 | 05 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,737 | $0 | Implemented |