IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0611 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,887 $5,685 Implemented
NC0611 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,179 $92,653 Implemented
NC0611 # 06 Y:2018 06 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,662 $200 Implemented
NC0611 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,370 $200 Implemented
NC0519 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $500 Implemented
NC0519 # 01 Y:2014 01 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $207,427 $102,000 Implemented
NC0519 # 04 Y:2014 04 2014 REPAIR AND ELIMINATE STEAM LEAKS $21,819 $2,200 Implemented
NC0519 # 03 Y:2014 03 2014 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $104,811 $52,500 Implemented
NC0519 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,692 $258,028 Implemented
NC0482 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,890 $100 Implemented
NC0482 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,366 $33,811 Implemented
NC0340 # 11 Y:2006 11 2006 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $20,000 $20,000 Implemented
NC0340 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $50 Implemented
NC0340 # 08 Y:2006 08 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $500 Implemented
NC0340 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,998 $0 Implemented
NC0340 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $879 $220 Implemented
NC0340 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $4,704 $1,500 Implemented
NC0340 # 02 Y:2006 02 2006 CLOSE OFF UNNEEDED STEAM LINES $13,322 $0 Implemented
NC0340 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $1,720 $1,800 Implemented
NC0322 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $217 $2,000 Implemented
NC0322 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $723 $298 Implemented
NC0322 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,592 $821 Implemented
NC0322 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $573 $0 Implemented
NC0322 # 02 Y:2005 02 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $8,353 $2,650 Implemented
NC0322 # 01 Y:2005 01 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $139,400 $9,500 Implemented