IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,112

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0081 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,904 $1,546 n/a
SF0081 # 06 Y:1996 06 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,361 $2,400 n/a
SF0081 # 07 Y:1996 07 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,669 $26,800 n/a
SF0081 # 08 Y:1996 08 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,026 $875 n/a
SF0081 # 09 Y:1996 09 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,057 $0 n/a
SF0081 # 10 Y:1996 10 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,492 $225 n/a
SF0081 # 11 Y:1996 11 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,077 $75 n/a
UL0145 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $1,151 Not Implemented
UL0145 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,159 $8,988 Not Implemented
UL0145 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $30,246 $21,220 Not Implemented
UL0145 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,624 $60 Not Implemented
UL0145 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,450 $60 Not Implemented
IA0131 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $33,809 $11,700 Not Implemented
IA0131 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,688 $64,875 Implemented
IA0131 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,393 $9,302 Implemented
IA0131 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,757 $390 Implemented
IA0131 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,181 $25 Implemented
IA0131 # 06 Y:1995 06 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $167 $360 Not Implemented
IA0118 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,717 $25,220 Implemented
IA0118 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,263 $1,888 Not Implemented
IA0118 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,614 $4,330 Implemented
IA0118 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $957 $610 Implemented
IA0118 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,175 $485 Implemented
IA0118 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,004 $25 Not Implemented
IA0118 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,861 $12,260 Not Implemented