IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 2676 Sanitary Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0231 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,414 $80 Implemented
DL0070 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $104,177 $157,000 Implemented
DL0070 # 04 Y:2011 04 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $14,330 $500 Implemented
DL0070 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $12,200 $200 Implemented
DL0070 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $136,635 $120,000 Implemented
DL0070 # 08 Y:2011 08 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $21,528 $52,000 Implemented
UU0069 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,879 $11,735 Implemented
UU0069 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,497 $268 Implemented
UU0069 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,560 $0 Implemented
UU0069 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,545 $2,000 Implemented
MA0536 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $112,689 $118,000 Implemented
MA0536 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $91,341 $30,000 Implemented
MA0536 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,338 $60,000 Implemented
MA0536 # 04 Y:2003 04 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $69,333 $5,900 Implemented
MA0536 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $5,400 $2,600 Implemented
AS0340 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $5,518 Implemented
AS0340 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $155 $20 Implemented
AS0340 # 11 Y:2002 11 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,624 $4,800 Implemented
AS0340 # 13 Y:2002 13 2002 CLEAR AND RENT EXISTING SPACE $60,660 $8,804 Implemented
AS0241 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,241 $120 Implemented
AS0241 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $132 $225 Implemented
AS0241 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $700 Implemented
AS0241 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,122 $1,420 Implemented
UL0210 # 03 Y:1998 03 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,000 $0 Implemented
WI0335 # 02 Y:1998 02 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $7,600 $0 Implemented