IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0840 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $2,301 Implemented
GT0840 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,943 $3,750 Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented
SU0207 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Implemented
SU0207 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $477 Implemented
SU0207 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $55 $92 Implemented
WV0294 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $5,704 $230 Implemented
WV0294 # 04 Y:2004 04 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,247 $2,660 Implemented
WV0294 # 06 Y:2004 06 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,472 $920 Implemented
WV0294 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,431 $784 Implemented
WV0294 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,317 $215 Implemented
WV0294 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $609 $46 Implemented
LM0076 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $528 $25 Implemented
LM0076 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,952 $1,300 Implemented
LM0076 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $255 $281 Implemented
LM0076 # 05 Y:2004 05 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,736 $2,500 Implemented
LM0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,513 $880 Implemented
MS0220 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118,492 $100 Implemented
SU0146 # 04 Y:2002 04 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $4,723 $420 Implemented
SU0146 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,500 $852 Implemented
SU0146 # 06 Y:2002 06 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $799 $1,690 Implemented
SU0146 # 07 Y:2002 07 2002 PAY UTILITY BILLS ON TIME $791 $0 Implemented