Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
192
matching recommendationsSIC | 273 | Books |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0414 # 03 Y:1998 | 03 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $670 | $0 | Implemented |
CO0414 # 04 Y:1998 | 04 | 1998 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $120 | $0 | Implemented |
CO0414 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $88,140 | $7,100 | Implemented |
CO0414 # 06 Y:1998 | 06 | 1998 | MOVE PRODUCT USING MECHANICAL MEANS | $6,760 | $12,680 | Implemented |
CO0414 # 07 Y:1998 | 07 | 1998 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $1,840 | $4,260 | Implemented |
ND0273 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $355 | $715 | Implemented |
ND0273 # 05 Y:1997 | 05 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,271 | $688 | Implemented |
ND0273 # 07 Y:1997 | 07 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $116,808 | $15,230 | Implemented |
ND0273 # 08 Y:1997 | 08 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $51,750 | $3,780 | Implemented |
ND0273 # 09 Y:1997 | 09 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $82 | $395 | Implemented |
ND0273 # 11 Y:1997 | 11 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,719 | $5,060 | Implemented |
OD0084 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $818 | $589 | Implemented |
OD0084 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,487 | $1,724 | Implemented |
OD0084 # 05 Y:1997 | 05 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,624 | $1,495 | Implemented |
OD0084 # 08 Y:1997 | 08 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $28,563 | $11,432 | Implemented |
HO0137 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,704 | $2,559 | Implemented |
HO0137 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $724 | $610 | Implemented |
HO0137 # 03 Y:1996 | 03 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,210 | $2,997 | Implemented |
HO0137 # 04 Y:1996 | 04 | 1996 | USE FLUE GAS RECUPERATION TO REDUCE VOC | $500,000 | $2,000 | Implemented |
HO0137 # 05 Y:1996 | 05 | 1996 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $50,000 | $25,000 | Implemented |
WI0274 # 03 Y:1996 | 03 | 1996 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $3,082 | $10,500 | Implemented |
WI0274 # 05 Y:1996 | 05 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $905 | $700 | Implemented |
WI0274 # 06 Y:1996 | 06 | 1996 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $748 | $1,000 | Implemented |
WI0274 # 08 Y:1996 | 08 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $331 | $640 | Implemented |
MO0173 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $2,271 | Implemented |