IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,451

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0356 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $20 Implemented
AS0356 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $87 Implemented
AS0356 # 11 Y:2003 11 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,280 $17,100 Implemented
AS0356 # 12 Y:2003 12 2003 CLEAR AND RENT EXISTING SPACE $96,000 $8,340 Implemented
WI0446 # 01 Y:2003 01 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $20,491 $40,000 Implemented
WI0446 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,528 $500 Implemented
WI0446 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $1,359 Implemented
WI0446 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $945 $740 Implemented
GT0758 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,720 $47,268 Implemented
GT0758 # 02 Y:2003 02 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,072 $12,000 Implemented
GT0758 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $322 $0 Implemented
GT0758 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,420 $1,850 Implemented
LM0057 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $1,430 Implemented
LM0057 # 02 Y:2003 02 2003 ADD AREA LIGHTING SWITCHES $2,375 $3,580 Implemented
LM0057 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $140 Implemented
LM0057 # 04 Y:2003 04 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $140,025 $42,126 Implemented
LM0057 # 05 Y:2003 05 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $47,858 $12,520 Implemented
LE0149 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,655 $340 Implemented
LE0149 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,182 $1,000 Implemented
LE0149 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,441 $260 Implemented
LE0149 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,547 $1,200 Implemented
LE0149 # 05 Y:2002 05 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,578 $25,000 Implemented
LE0149 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $886 $750 Implemented
LE0149 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $472 $75 Implemented
LE0149 # 08 Y:2002 08 2002 INSTALL TIMERS AND/OR THERMOSTATS $4,252 $2,100 Implemented