IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 2782 Blankbooks And Looseleaf Binders
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0306 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,662 $2,550 Implemented
MS0306 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,093 $180 Implemented
CO0445 # 03 Y:1999 03 1999 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $820 $1,000 Implemented
CO0445 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $1,000 Implemented
MS0127 # 02 Y:1999 02 1999 INSTALL TIMERS AND/OR THERMOSTATS $584 $236 Implemented
MS0127 # 08 Y:1999 08 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $156,180 $23,010 Implemented
MS0127 # 03 Y:1999 03 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $140 $54 Implemented
MS0127 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,685 $1,202 Implemented
HO0172 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $13,312 Implemented
HO0172 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,492 $300 Implemented
HO0172 # 05 Y:1998 05 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $316 $47 Implemented
HO0172 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $575 $20 Implemented
KG0075 # 01 Y:1996 01 1996 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $26,746 $0 Implemented
KG0075 # 03 Y:1996 03 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,390 $0 Implemented
KG0075 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $10,802 $1,350 Implemented
AM0278 # 01 Y:1996 01 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $11,610 $55,390 Implemented
AM0278 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,600 $300 Implemented
AM0278 # 02 Y:1996 02 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,050 $29,160 Implemented
AM0278 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,900 $140 Implemented
AM0278 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,150 $800 Implemented
AM0278 # 09 Y:1996 09 1996 RECOVER AND REUSE WASTE MATERIAL $12,270 $2,500 Implemented
AM0278 # 08 Y:1996 08 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $27,000 $0 Implemented
AM0278 # 07 Y:1996 07 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $680 $0 Implemented
AM0278 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $410 Implemented
MA0356 # 01 Y:1996 01 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,400 $118,450 Implemented