IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2789 Bookbinding And Related Work
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0425 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,344 $4,750 Implemented
SU0425 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $204 $0 Implemented
SU0425 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,154 $0 Implemented
BD0318 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,077 $1,077 Implemented
IC0034 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,466 $800 Implemented
IC0034 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $677 $0 Implemented
IC0034 # 08 Y:2002 08 2002 MAINTAIN MACHINES TO REDUCE LEAKS $10,423 $0 Implemented
GT0656 # 01 Y:1998 01 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,632 $7,000 Implemented
GT0656 # 03 Y:1998 03 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,440 $0 Implemented
GT0656 # 04 Y:1998 04 1998 AUTOMATE FINISHING PROCESS $15,600 $15,000 Implemented
UM0101 # 06 Y:1998 06 1998 $28,625 $2,800 Implemented
UM0101 # 05 Y:1998 05 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $29,383 $3,166 Implemented
UM0101 # 04 Y:1998 04 1998 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $20,800 $200 Implemented
UM0101 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $3,067 $2,520 Implemented
UM0101 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,749 $36,857 Implemented
AS0131 # 06 Y:1994 06 1994 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,803 $990 Implemented
AS0131 # 05 Y:1994 05 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,182 $6,400 Implemented
AS0131 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,722 $1,050 Implemented
AS0131 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,456 $2,454 Implemented
AS0131 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,284 $2,362 Implemented
KU0080 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $123 $330 Implemented
KU0080 # 04 Y:1983 04 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $296 $175 Implemented