IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,859

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0312 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $9,806 $3,600 Implemented
MI0312 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $9,922 $1,995 Implemented
MI0312 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $9,752 $8,000 Implemented
MI0312 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,544 $19,300 Implemented
MI0312 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,938 $960 Implemented
MI0312 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,241 $1,660 Implemented
TT0193 # 01 Y:2017 01 2017 INSULATE BARE EQUIPMENT $35,857 $10,000 Implemented
TT0193 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,374 $32,000 Implemented
TT0193 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $3,000 Implemented
TT0193 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $949 $125 Implemented
TT0193 # 09 Y:2017 09 2017 INSTALL TIMERS AND/OR THERMOSTATS $464 $2,000 Implemented
MZ0228 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,062 $0 Implemented
MZ0228 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,002 $1,080 Implemented
MZ0228 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $1,772 Implemented
MZ0228 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $280 Implemented
MZ0228 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $340 Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
GT0897 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $499 $607 Implemented
GT0897 # 04 Y:2017 04 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,316 $19,418 Implemented
GT0897 # 05 Y:2017 05 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,351 $15,070 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented
SD0548 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,809 $47,543 Implemented
SD0548 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $4,954 $5,368 Implemented
SD0548 # 04 Y:2017 04 2017 DISCONNECT BALLASTS $4,196 $2,050 Implemented
SD0548 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $2,573 $5,317 Implemented